DOI:
https://doi.org/10.37547/tajet/Volume06Issue05-03Keywords:
Frame reinforced concrete reconstructionAbstract
This article examined the technical condition of a 2-story retail and household complex located in the city of Tashkent, and provided the necessary recommendations for reconstruction. The building is a reinforced concrete frame system and the survey process used existing methods and computer software.
References
Ledenev V.V., Yartsev V.P. Inspection and monitoring of building structures of buildings and structures / Tambov: Publishing House of the Federal State Budgetary Educational Institution of Higher Education "TSTU", 2017. - 252 p.
S. Yusufkhojaev, R. Yusupov, X. Alimov, J. Makhmudov, E. Choi, Crack Resistance of Prestressed Reinforced Concrete Beams with Wire Rope Reinforcement. Materials, 16, 6359 (2023) https://doi.org/10.3390/ma16196359
Юсупов, Р., Алимов, Х., Хужаев, Д., & Алтаева, Л. (2024). ДЕФЕКТЫ И ПОВРЕЖДЕНИЯ ЖЕЛЕЗОБЕТОННЫХ КОНСТРУКЦИЙ КАРКАСНЫХ ЗДАНИЙ В СЕЙСМИЧЕСКИХ РАЙОНАХ. GOLDEN BRAIN, 2(5), 190-200.
YUSUPOV R.R, ALIMOV Х.T, AZIMOV A.A, & SAYDULLAYEVA D.Q. (2023). Results of the Survey of the Technical Condition of A NineStorey Reinforced Concrete Frame Public Building. Texas Journal of Engineering and Technology, 21, 84–88. Retrieved from https://zienjournals.com/index.php/tjet/article/view/4176
KMK 2.01.03-19. Construction in seismic areas. Ministry of Construction of the Republic of Uzbekistan. Tashkent, 2019.
