Authors

  • Bozorov R.Sh
  • Boboev D.Sh

Author Biographies

  • Bozorov R.Sh

    1,2Tashkent State transport University (Tashkent, Uzbekistan).

  • Boboev D.Sh

    1,2Tashkent State transport University (Tashkent, Uzbekistan).

DOI:

https://doi.org/10.71337/inlibrary.uz.mead.117065

Keywords:

cargo placement fastening drawer binder tie rack crossbar.

Abstract

the article shows the selection of optimal options for quality service methods when placing and fixing goods on wagons during the delivery process. The means of fastening goods to wagons were researched and measures and proposals for their selection were developed. In addition, the process of fastening the goods was analyzed and proposals were made for fixing the goods to the wagons in order to eliminate the shortcomings of the existing system.


background image

MODERN EDUCATION AND DEVELOPMENT

Выпуск журнала №-26

Часть–8_ Май –2025

3

RESEARCH OF MEANS OF FASTENING GOODS TO WAGONS IN

RAIL TRANSPORT

Bozorov R.Sh.

1

, Boboev D.Sh.

2

1,2

– Tashkent State transport University (Tashkent, Uzbekistan).

Keywords: cargo placement, fastening, drawer, binder, drawer, tie, rack,

crossbar.

Annotation: the article shows the selection of optimal options for quality

service methods when placing and fixing goods on wagons during the delivery process.

The means of fastening goods to wagons were researched and measures and proposals

for their selection were developed. In addition, the process of fastening the goods was

analyzed and proposals were made for fixing the goods to the wagons in order to

eliminate the shortcomings of the existing system.

Introduction.

Local technical conditions (in the next place – MTU) or cargo placement and

strengthening schemes (in the next place – NTU) are used for the methods of placing

and strengthening cargo intended for transportation as part of open movement, but not

provided for in this Tu. This MTU or NTU will be developed under the requirements

of Chapter 1 of this TUning.

If multiple reinforcement tools are used in cargo transportation, then the

positioning and reinforcement scheme for the return of such tools in an empty state is

developed as part of the MTU or NTU. Multiple reinforcement tools shipped in idle

condition are shipped on the basis of the appropriate MTU or NTU without further

arrangements, or other MTU or NTU is developed in accordance with the provisions

of this chapter.Figure 1 shows the means of fixing loads placed on the platforms.

The technical conditions for the placement and strengthening of cargo (next –

TU) determine the methods of placement and strengthening of cargo in 1520 mm

tracked wagons and establish the procedure for the development of placement and

strengthening methods not provided for in TU.


background image

MODERN EDUCATION AND DEVELOPMENT

Выпуск журнала №-26

Часть–8_ Май –2025

4

Main part.

If the method of its placement and strengthening when submitting a cargo for

transportation is provided for in this TU, a sketch can be developed that shows the

parameters of the cargo in cases required by national legislation. This sketch confirms

that the method of placement and reinforcement of the load is consistent with this TU.

This rule does not apply to the methods of placing and strengthening loads in

accordance with Chapter 5 of this TU.

The placement and strengthening of cargo is carried out under the guidance of

a person who has passed the verification of knowledge on this TU in the manner

prescribed by national legislation. This TU is applied to the transportation of goods as

part of freight trains at operating speeds of up to 100 km/h [1].

The requirements for materials used as reinforcement tools are established on

the basis of the standards of the Russian Federation (GOST), which are referenced in

this TU Text [2]. For reinforcement tools, it is allowed to use materials produced

according to other regulatory and technical documents, if their characteristics meet the

requirements of the specified standards. These TUda physical magnitudes are listed in

the MKGSS system of units. In the SI system, the following ratios must be used to

represent values of magnitudes:

1 kgs – 9,8 N;

1 ts – 9,8×10³ N;

1 ts/t – 9,8×10³ N/t;

1 kgs/m² – 9,8 Pa;

1 kgs/sm² – 9,8×10⁴ Pa;

1 ts/m² – 9,8×10³ Pa.

The following tools are used for fastening goods on wagons: base drawers

(Rastyajka) – used to attach the load from one end to the load fixing device, and from

the other end to a special device on the wagon div [3]. Spindle drawers (Obvyazka)

– used to wrap the load completely and attach it to the special fastening devices of the

wagon. Fastening ties (Styrofoam) – are used to join and tighten other fastening tools

(caps, ties, support posts, etc. Connecting ties (Uvyazka) – are used to connect multiple


background image

MODERN EDUCATION AND DEVELOPMENT

Выпуск журнала №-26

Часть–8_ Май –2025

5

load units and fasten them as a single load. Wooden supports and posts – used to keep

the load stable [4]. Coating panels and blocks – applied to prevent load shifting.

"Spurs" and carcasses – designed to hold the load more firmly. Cassettes, pyramids,

bearings and turnstiles – are used as special structures for stable fixation of loads of

various shapes. Fastening tools can be disposable or multiple (reusable). When

installing fasteners in wagons, the following standard fastening elements are used:

Bolts (bolts), spindles, nails, construction staples and other fastening details.

A puller is a fastener (fastened) that connects with one end to a tying device in

a load, and with the other end to a tie device specially designed for this in a wagon

div. A binder is a (fastened) fastener that connects the load to the binder in the wagon

div with the coverage and both ends. A drawer is a fastening tool designed to cross-

attach and pull other fasteners (usually a drawer, binder, columns). A link is a fastening

tool designed to combine individual load units into a single load position.

The following materials are used to make drawers, ties, drawers, ties:

- from thermally processed steel wires in the case of round-cut (GOST 2590),

square-cut (GOST 2591;

- from steel rolling or tape (GOST 103);

- from steel chains or ropes.

Figure 1. Tools for fastening cargo to wagons:

a-transverse cross section of various loads placed on the platform; b-cross

section of load placed on the platform; 1-Pull; 2-tie; 3-Pull; 4-tie; 5-overhang; 6 –

gasket; 7 – columns; 8 – and 9 – sidebar and hem hem hem beams; 10 – side hem

а

b


background image

MODERN EDUCATION AND DEVELOPMENT

Выпуск журнала №-26

Часть–8_ Май –2025

6

beams; 11 – and 12-sidebar and hem hem skobes; 13-base kronshtein on the hem hem

hem hem beam.

Round cross-section steel rolling wires should be no less than 5 mm in

diameter, non-round steel rolling wires should be no less than 20 mm2 in cross-section

surface [5].

They have special devices for fixing drawers and fasteners to wagons.

- on the platformers: side and hem column skobes, base kronshtein on the hem

barrier; side skobes on platforms for large tonnage containers and wheeled equipment;

- in semi-open wagons: oysters tie device (cosines); intermediate tie device

located on the sidewall fence, at an altitude of 1100 – 1200 mm from the floor; skoba-

shaped upper tie device.

Oysters and gaskets are made of non-inferior tilting (wood) materials of the

third variety. From Birch, Mountain Birch (ansox), hemp and argan (Linden), it is

allowed to make tightening-working ostriches and gaskets, but they are not fastened

with trellis and kashak trellis fences and other fastening elements. It is not allowed to

use these tree breeds, as well as all dry hardwood zorts, in the preparation of Rake and

kashak rake fences. If the load is not damaged, it is allowed to make a lining and gasket

from metals of different shapes, reinforced concrete and other materials [6].

Oysters and gaskets are used to increase the load-bearing area on the wagon

floor, to prevent the load barrel from deviating, to ensure the possibility of mechanizing

the increase and unloading of cargo, to protect the cargo and wagon from damage to

the base surface, and to fasten the rake and kashak rake barriers. If the intended

requirements are provided without the use of a sealant and gasket, it is not necessary

to install them [7,8].

The height of the lining and gasket should not be less than 25 mm, and the

width should be less than 80 mm, and in this the ratio to the height of the width should

not be less than 1.5. The length of the rack, which is placed by the width of the wagon,

is obliged to make the wagon div wide, and the gasket – the width of the load [9].

Wooden poles, the trunk of which is not cleaned and the trunk is cleaned, are

used to block the stocked loads by the side and skirt, making them from round wood


background image

MODERN EDUCATION AND DEVELOPMENT

Выпуск журнала №-26

Часть–8_ Май –2025

7

materials or straight fiber-polished (wood) materials according to GOST 8486 and

GOST 2695. Columns made of round wood materials should be 120 – 140 mm at the

bottom trim and 90 – 120 mm at the top trim. The trim of the columns made of polished

(wood) materials should not be less than 90 x 120 mm. The width of the columns

installed on semi-open wagons should not be less than 100 mm, at the level of its upper

sarrovi.

Conclusion.

For fastening loads to wagons, pull-ups (rastyajka), ties

(obvyazka), pull-ups (styajka), ties (uvyazka), ties (upornie) and cash-straws

(raspornie) barriers (Bruski), posts (stoyki), ostlik (podkladki), gaskets (prokladki),

Shields (tshiti), tourniquet and the like are used many times, as well as standard

fasteners. When installing fastening elements and tools, standard fastening items are

used, for example, bolts, spills, nails, building dust (skoba). It is not allowed to fasten

the pulleys and fasteners to other details of the wagon div, as well as to the skobs

designed for column fastening inside the wagon div, to the fastening ring on the semi-

open wagon top sarrova, and to the rings on the outer surface of the platform section

boards.

REFERENCES

1.

Bozorov R.Sh., Saidivaliev Sh.U., Shermatov E.S., Boboev D.Sh. Research on

establishing the optimal number of platforms in a container train. Transport: science,

technology, management. Scientific information collection. 2022. No. 5. P. 24-28.

2.

Diyor Shomuratovich Boboev, Ramazon Shamilovich Bozorov, Elbek

Sirojiddinovich Shermatov.

Choose types of transport and improve their cooperation

in the process of delivery of cargo.

"

Economy and society " №5(84),

2021, 98-105.

3.

Ziyoda Mukhamedova, Diyor Boboev. Research on improving the modern

transport system in the process of cargo delivery. Railway transport: current issues and

innovations, 3(1), 2022/3/28, 15–24.

4.

Jamol Shikhnazarov, Diyor Boboev. Analysis of the effective use of wagons in

the process of freight delivery in railway transport. Academic research in educational

sciences, 2(5), 2021, 210-216.


background image

MODERN EDUCATION AND DEVELOPMENT

Выпуск журнала №-26

Часть–8_ Май –2025

8

5.

Jamol Shihnazarov, Diyor Boboev, Elbek Shermatov. Investigation of the

longitudinal forces acting during the transportation of flat cargo on sites in the road

profiles with a slope of railway transport. AIP Conference Proceedings, 2432(1),

2022/6/16, 030112.

6.

Diyor Shomurotovich Boboyev. Organization of innovative technology of cargo

transportation through counter-trailer terminals. Innovative research in the modern

world: Theory and practice, 1(12), 2022/4/15, 11-19.

7.

Z.G. Muhamedova, D.Sh. Boboyev. Research on the improvement of modern

transportation

systems

in

the

process

of

cargo

delivery.

Railway

Transport,1(16),2022,16-19.

8.

Zhamshid Renatovich Kobulov, Zhamshid Saifullaevich Barotov, Diyor

Shomurotovich Boboev. Improving the freight transportation system on rail transport

with wagon shipments. Current issues in economics and management: science and

practice. Kriulinsky readings. Collection of materials of the All-Russian scientific and

practical conference. Kursk, 15.05.2021, 199-203

.

9.

Jamshid Renatovich Kobulov, Jamshid Sayfullayevich Barotov, Diyor

Shomurotovich Boboyev. Improvement of the cooling system during storage in the

process of agricultural products.

Journal of Tashkent Institute of Railway Engineers.

16(2), 2020, 200-204.